Development 工程 Division

分享 & 书签, Press Enter to show all options, press Tab go to next option
打印

 

十大电子游戏平台:

108 E. 普洛克特圣.                                           许可中心位置图
卡森市,内华达州89701
电话:(775)887-2300
传真:(775)887-2283

工作时间:上午8点.m. 到下午4点.m. 
中午十二时正休息.m. 至下午1时.m.
封闭的假期 

关于我们

The Development 工程 Division is responsible for site civil engineering plan review, 允许, 和检查. Areas of purview may include grading, 风暴排水, 饮用水, 再生水, 卫生下水道, 特许公用事业(燃气), 权力, 通信), 大街上的改进, 抑制 & gutter, sidewalks, parking lot paving, striping and signage.

We also provide a number of other resources to the community including flood plain information, 洪水高程证书, 水和下水道公用事业地图, 公共雨水渠地图, archived record drawings for past site civil projects, 土地划分图, 检验记录, and public right-of-way and easement records. 

设计标准

The 卡森城 Development Standards have been pr环境保护署red to provide in one convenient location the various City design requirements for developing and constructing private and public projects within the City.  They are supplemented with the 卡森城 Standard Details for 公共工程 Construction / 7-2001

The Development Standards can be found at the following links: 

联邦应急管理局防洪计划

The Development 工程 Division keeps FEMA flood maps and elevation certificates on file and will gladly assist the public with obtaining information for specific properties within 卡森城.  Information regarding FEMA flood maps and insurance may also be found at the following web site:  http://www.fema.gov /洪WaterMaps

环保署雨水计划

Information regarding the EPA National Pollutant Discharge Elimination System (NPDES) 雨水 Program can be found at the following web site: http://www.epa.gov/npdes/npdes-stormwater-program

Mandatory 下水道 Connection Program

“The Mandatory 下水道 Connection Program was created and defined by Resolution No. 1995-R-31 to protect the groundwater supply from contamination from septic systems in the southeast area of 卡森城. 12 phases were identified which consisted of areas in 卡森城 where the density of individual sewage disposal systems was a concern. To date, 9 of the 12 phases have been completed. An updated resolution, Resolution No. 2023-R-4, was created for the 3 remaining phases which are phases 9, 10 and 12. The resolution requires that all properties in the designated areas must sewer their properties using the 卡森城 sewer system, 当它可用时. The resolution allows for the waiving of the current sewer connection fee and permit fees if the property owners connect within 48 months of notification that sewer has become available.  The Southeast 卡森城 Mandatory 下水道 Connection Program area is defined as being bounded by parcels adjacent to the south side of Clear Creek Road and Snyder Avenue to the south, east side of Highway 395 to the west, south of Kingsley Lane to the north, and BLM property east of Gentry Lane. For more information on upcoming project phases, please visit http://www.卡森.org/government/departments-g-z/public-works/sewer-extension-project

常用表格

External 工程 Site Plan Review Checklist 2023

卡森市街道名称搜索

 Right-of-Way Encroachment Agreement

Downtown Encroachment 允许应用程序

材料测试协议

允许应用程序

 

常见问题

Q: Who do I call if my septic system fails?

A: Please call the 健康 D环境保护署rtment for information, 887-2190.

Q: Who do I call for information on wells?

A: Please call the 健康 D环境保护署rtment for information, 887-2190.